8.3 KiB
8.3 KiB
AI Automation Mainline Work Items
Updated: 2026-07-10 Governance:
global_product_governance_v2+ ADR-038 Current P0:SEC-P0-001 deny-by-default access control
Source Of Truth
- Production runtime receipt/post-verifier/durable DB receipt is authoritative.
- Gitea main, deploy marker, CD run and production readback are the only source/deploy truth; GitHub remains frozen.
- Source/test/UI/CD green does not mean runtime closure.
- Completion must report program, asset coverage and runtime closure separately.
- PixelRAG visual evidence cannot write formal prices or
ai_insightsbefore identity, PromotionGate and internal RAG canary proof.
Ordered P0
| Order | ID | Status | Work item | Exit evidence / next machine action |
|---|---|---|---|---|
| 1 | SEC-P0-001 |
In progress | Deny-by-default route access control | Central policy now protects vendor/import/CI-CD/crawler/category/log/operator and sales-detail surfaces; every anonymous GET is explicitly allowlisted. Exit: anonymous production matrix passes and /metrics moves behind edge/internal auth. Next: verify_production_anonymous_matrix_and_move_metrics_behind_edge_auth. |
| 2 | SEC-P0-002 |
Not started | Database identity + least-privilege RBAC | Replace shared admin password, default-admin fallback, process-local lockout and spoofable proxy identity. Exit: shadow auth, role matrix, durable audit/lockout, session revocation and canary cutover. |
| 3 | SEC-P0-003 |
In progress | Webhook trust and replay protection | Telegram secret-token verification code exists; production secret activation remains unproven. Exit: secret provisioned outside source, required mode enabled, invalid-secret 401 and authorized callback canary pass. |
| 4 | SUPPLY-P0-001 |
In progress | Gitea-only secure software supply chain | Gitea-native checkout and governance gate added. Exit: exact dependency lock, internal SAST/SCA/secret scan, SBOM, image digest/provenance, vulnerability SLA and production digest readback. |
| 5 | GOV-P0-001 |
In progress | Canonical full asset graph + runtime reconciliation | governance/ewoooc_asset_inventory.json seeds hosts, services, data, AI, routes, supply chain, observability and recovery. Exit: same-run probe receipt for every asset; drift auto-creates work items. |
| 6 | GOV-P0-002 |
Not started | Unified controlled-apply envelope | Introduce one trace_id/run_id/work_item_id across sensor, identity, SOT diff, decision, risk, dry-run, execution, verifier, rollback/retry and learning acknowledgement. Start with EventRouter + AutoHeal. |
| 7 | RAG-P0-001 |
Not started | Internal RAG candidate canary | V10.770 stops at candidate preview. Exit: bounded pgvector candidate canary, signature/readback/feedback receipt, no price write and no premature ai_insights promotion. Next: run_internal_rag_candidate_canary. |
| 8 | MCP-P0-001 |
In progress | MCP/RAG production runtime closure | Registry and smoke wiring exist, but runtime flags/ports must be live. Exit: MCP servers healthy, router enabled, RAG enabled, approved caller/tool boundary and production query canary pass. |
| 9 | SEC-P0-004 |
Not started | Security operations lifecycle and metrics | Add durable security incident state and publish MTTA, MTTR, recurrence, false positive, human intervention, verifier pass, rollback and freshness. Exit: detect-to-learn production receipt. |
| 10 | REL-P0-001 |
In progress | Formal deploy and visible proof discipline | Every functional change bumps version, passes Gitea CD, deploys only three app containers, leaves momo-db untouched, and reads back /health, new APIs and visible UI/security behavior. |
P1
| Order | ID | Status | Work item | Exit evidence / next machine action |
|---|---|---|---|---|
| 11 | RES-P1-001 |
Not started | Backup/offsite/restore automation | Fresh checksum and offsite coverage plus isolated non-destructive restore drill with measured RPO/RTO. |
| 12 | PLAT-P1-001 |
Not started | Non-root container and capability hardening | Shadow non-root image, writable-path inventory, capability drop/read-only filesystem canary, three-app rollout. |
| 13 | APPSEC-P1-001 |
In progress | CSP and DOM/XSS hardening | Security headers are present and CSP is report-only. Collect violations, remove high-risk innerHTML/inline sinks, then enforce CSP by canary. |
| 14 | APPSEC-P1-002 |
Not started | Unsafe shared-cache serialization removal | Replace writable pickle caches in dashboard/daily-sales/EDM/sales with constrained JSON or signed schema. |
| 15 | ARCH-P1-001 |
In progress | Split oversized policy/executor/verifier modules | Current top debts include 44k-line PChome mapping and 14k-line smoke service. Split by bounded family and independent tests. |
| 16 | UX-P1-001 |
In progress | Professional full-site UI/UX | Complete first-viewport cockpit, progressive disclosure, text-density reduction, Traditional Chinese product copy, accessibility, loading/error/empty/degraded states and desktop/mobile visual smoke. |
| 17 | PIXELRAG-P1-001 |
Not started | Ollama-first multimodal embedding benchmark | Verify approved visual embedding on GCP-A -> GCP-B -> 111 and design pgvector-compatible visual metadata; FAISS remains disallowed without ADR. |
| 18 | MARKET-P1-001 |
In progress | Marketplace source contracts | Finish stable, public-boundary, provenance and rate-limit contracts for Shopee, Coupang, Yahoo, ETMall, Friday and Rakuten; blocked pages remain non-product data. |
| 19 | QA-P1-001 |
In progress | Deterministic test and CI governance | Current baseline is 1,701 passed / 30 legacy failures / 9 skipped plus one missing report module at collection. Restore or retire the missing contract, remove wall-clock/copy drift, and split deterministic release tests from nightly integration and production canaries. |
P2
| Order | ID | Status | Work item | Exit evidence / next machine action |
|---|---|---|---|---|
| 20 | GOV-P2-001 |
Not started | Continuous NIST/ASVS control trend | Persist governance snapshots, compare control/asset/runtime drift and create ordered work items automatically. |
| 21 | DATA-P2-001 |
Not started | Data classification and retention enforcement | Classify business, personal, operational and model data; automate retention, deletion eligibility and audit evidence without destructive default actions. |
| 22 | CHAOS-P2-001 |
Not started | Controlled resilience exercises | Run non-destructive model-host, MCP, queue, Telegram and app-container failure drills with rollback and learning receipts. |
Completed Foundations
These are reusable foundations, not proof that the full program is complete.
| Status | Capability | Current boundary |
|---|---|---|
| Completed | Multi-commerce PixelRAG visual evidence for momo, pchome, shopee_tw, coupang_tw, yahoo_shopping_tw, etmall_tw, friday_tw, rakuten_tw | Evidence-only; blocked pages are not product data. |
| Completed | External MCP/RAG capability inventory | Registry/integration readback exists; runtime enablement remains P0. |
| Completed | PixelRAG receipt -> RAG candidate replay | Candidate-only; no formal knowledge or price write. |
| Completed | Source-contract replay worker | Public-boundary artifact receipts only. |
| Completed | Marketplace adapter preflight and dry-run | Deterministic no-write contracts. |
| Completed | Marketplace identity matcher replay | Candidate identity only. |
| Completed | PromotionGate replay | No production write. |
| Completed | Embedding-signature guard replay | Signature readiness only. |
| Completed | Candidate knowledge replay | Internal RAG preview only; canary remains P0. |
| Completed | PixelRAG application portfolio | Commerce/RAG/UX/ops/marketing/governance inventory. |
| Completed | Ollama-first VLM route readiness and replay worker | Evidence-bound artifact output; no direct price write. |
| Completed | Platform probe worker | Shopee/Coupang barriers become structured fallback/backoff receipts. |
Definition Of Done
A work item can be Completed only when the same production run contains:
- sensor/source receipt;
- normalized canonical asset identity;
- source-of-truth diff;
- AI decision and candidate action;
- risk/policy decision;
- check-mode/dry-run receipt;
- idempotent bounded execution receipt;
- independent post-verifier and rollback/no-write terminal;
- incident/Telegram/KM/RAG/MCP/PlayBook durable acknowledgement.
Missing any stage means partial, degraded or blocked_with_safe_next_action.